Maldron Hotel, Brighton
Project
Maldron Hotel, Brighton
CLIENT
CField Construction
VALUE
£4.5m
DATE
Aug 22 - July 23
Works Undertaken - Basement and RC Frame. 8 floors RC frame with 3 no. cores. Due to location and weather conditions through winter months OBR slip formed 2 of the 3 cores and utilized Precast columns, skydecking for formwork to slabs and Bamtec rollout reinforcement.